Operation steps of the horizontal secondary structure column pump.
1. After we transport the equipment to the construction site, we must first place it on a flat surface, because the secondary structure pump will vibrate during operation. If the ground is uneven or the soil is loose, the pump will tilt after running for a while, and in severe cases, it may even tip over, which is very dangerous.
2. Secondary structure column pumpAfter placing it properly, we need to connect the pipes. A matching iron pipe will be connected to the pump's discharge outlet, and a hose will be connected to the end of the iron pipe for pouring. If operating indoors and the distance is very close, the hose can be connected directly, such as for pouring structural columns and other vertical columns, beams, etc.
3. Once everything is ready, we can operate ourSecondary structure column pumppump. We need to first connect the power supply. If the power indicator light is on, it means everything is normal. If it is not on, check if the wiring is reversed. If you do not understand, consult the manufacturer's technical personnel.
After the power is normally connected, first press "Oil Pump Start/Stop" to start the oil pump, then press "Pumping Start/Stop" so that our pump truck can smoothly pump out the concrete.